Two solar projects are currently underway in Saratoga Township. The first, a 1,200-acre, 150 MW facility which was initiated in 2019, is called the Wood County Solar Project. It is anticipated that this project will be in commercial operation by the end of 2022.
The second solar project, proposed and introduced in 2021 is called the Saratoga Solar Project.
Both will occupy portions of the property formerly designated for the Golden Sands Dairy.
Detailed information about each project can be found under its respective heading.