Like us on Facebook

This message is only visible to admins.
Problem displaying Facebook posts. Backup cache in use.
Click to show error
Error: The user must be an administrator, editor, or moderator of the page in order to impersonate it. If the page business requires Two Factor Authentication, the user also needs to enable Two Factor Authentication. Type: OAuthException

Find Us

Address
1120 State Highway 73 South
Wisconsin Rapids, WI 54494

Solar Projects

Two solar projects are currently underway in Saratoga Township. The first, a 1,200-acre, 150 MW facility which was initiated in 2019, is called the Wood County Solar Project. It is anticipated that this project will be in commercial operation by the end of 2022.

The second solar project, proposed and introduced in 2021 is called the Saratoga Solar Project.

Both will occupy portions of the property formerly designated for the Golden Sands Dairy.

Detailed information about each project can be found under its respective heading.

Follow Us on Facebook

This message is only visible to admins.
Problem displaying Facebook posts. Backup cache in use.
Click to show error
Error: The user must be an administrator, editor, or moderator of the page in order to impersonate it. If the page business requires Two Factor Authentication, the user also needs to enable Two Factor Authentication. Type: OAuthException

Find Us

Address
1120 State Highway 73 South
Wisconsin Rapids, WI 54494